Customer CasesMar 30, 20254 min read

Heavy Machinery to Germany

A 28-tonne injection moulding machine from a Foshan factory to a Stuttgart plant, including lifting and securing plans.

Heavy Machinery to Germany

At 28 tonnes the machine exceeded standard container internal width, so we used a 40-foot flat rack and obtained carrier approval for the out-of-gauge dimensions in advance.

Before loading we calculated the centre of gravity and designed a lashing plan combining wire rope and timber. At destination a heavy-lift certified trucking team delivered directly to the customer plant.

The door-to-door transit took 38 days with no deformation or paint damage on inspection. The customer subsequently awarded us three more machines from the same series.

Topics:OversizedEurope

Shipping the same kind of cargo?

Send the commodity and destination — we will model the same path for you.

Get a Quote